MU
Equipment HealthOffsitesEP-129

Electrical Panel EP-129

Medium Criticality

EP-129 · Electrical Panel · Offsites / Electrical Panel Area 1 · Mfr. Flowserve

Health trend stable
69%

Attention

Failure Probability

29%

Anomaly Score

32

Remaining Useful Life

228 Days

RUL Confidence

81%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

228

days

Remaining Days

5,472

hrs

Operating Hours

1,948

cycles

Remaining Cycles

81

%

Confidence

Likely failure mode: Contact Overheating

Maintenance Strategy Optimization

Current strategy: maintenance every 12 months

From

12mo

To

12mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-EP-129
Functional LocationOffsites / Electrical Panel Area 1
ManufacturerFlowserve
Install Date2022-03-21
Runtime Hours17,559 hrs
Last Maintenance2026-07-11
Next Maintenance2027-01-22

AI Recommendation

Maintenance Recommendation Agent

EP-129 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-07-11

WO-20451 · Lubrication top-up

Closed · 2026-07-11

WO-20452 · Bearing replacement

Closed · 2026-07-11