MU
Equipment HealthFCC UnitBR-140

Bearing BR-140

High Criticality

BR-140 · Bearing · FCC Unit / Bearing Area 3 · Mfr. Emerson

Health trend stable
84%

Healthy

Failure Probability

23%

Anomaly Score

19

Remaining Useful Life

216 Days

RUL Confidence

77%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

216

days

Remaining Days

5,184

hrs

Operating Hours

974

cycles

Remaining Cycles

77

%

Confidence

Likely failure mode: Fatigue Spalling

Maintenance Strategy Optimization

Current strategy: maintenance every 12 months

From

12mo

To

12mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-BR-140
Functional LocationFCC Unit / Bearing Area 3
ManufacturerEmerson
Install Date2017-12-10
Runtime Hours23,719 hrs
Last Maintenance2026-01-16
Next Maintenance2027-01-13

AI Recommendation

Maintenance Recommendation Agent

BR-140 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

FCC Wet Gas Compressor Overhaul

Starts 2026-08-24 · 5 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-01-16

WO-20451 · Lubrication top-up

Closed · 2026-01-16

WO-20452 · Bearing replacement

Closed · 2026-01-16