Digital TwinFCC UnitBR-140
Back

Bearing BR-140 — Digital Twin

Normal

BR-140 · Bearing · FCC Unit / Bearing Area 3 · Running · Normal Load

Criticality: High · Degradation: Normal

84%

Healthy

Failure Probability

23%

Remaining Useful Life

216 Days

Predicted Failure Mode

Fatigue Spalling

RUL Confidence

77%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

96%

Trailing sensor-fused health

Live

Current

84%

Failure probability 23%

AI Predicted

Predicted · 216d horizon

78%

Fatigue Spalling trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.79 mm/s2–5 mm/sNormal0/hr
Temperature49.94 °C40–70 °CNormal0/hr
RPM1440.11 rpm1400–1500 rpmNormal0/hr
Motor Load59.04 %50–80 %Normal0/hr
Pressure4.8 bar4–6 barNormal0/hr
Flow97.4 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition86.43 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Fatigue Spalling cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

BR-140 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-BR-140
Functional LocationFCC Unit / Bearing Area 3
ManufacturerEmerson
Install Date2017-12-10
Runtime Hours23,719 hrs
Last Maintenance2026-01-16
Open Equipment Health record