MU

Atmospheric Heater

High Criticality

F-104 · Furnace · CDU / Heater Section · Mfr. Sulzer

Health trend improving
88%

Healthy

Failure Probability

15%

Anomaly Score

11

Remaining Useful Life

222 Days

RUL Confidence

86%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

222

days

Remaining Days

5,328

hrs

Operating Hours

733

cycles

Remaining Cycles

86

%

Confidence

Likely failure mode: Tube Coking

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

28mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-104
Functional LocationCDU / Heater Section
ManufacturerSulzer
Install Date2020-11-04
Runtime Hours10,334 hrs
Last Maintenance2026-02-27
Next Maintenance2027-01-17

AI Recommendation

Maintenance Recommendation Agent

F-104 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

CDU Preheat Train Inspection

Starts 2026-09-29 · 3 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-02-27

WO-20451 · Lubrication top-up

Closed · 2026-02-27

WO-20452 · Bearing replacement

Closed · 2026-02-27