MU

Crude Preheat Exchanger

High Criticality

E-103 · Heat Exchanger · CDU / Preheat Train · Mfr. Atlas Copco

Health trend stable
71%

Attention

Failure Probability

33%

Anomaly Score

29

Remaining Useful Life

181 Days

RUL Confidence

78%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

181

days

Remaining Days

4,344

hrs

Operating Hours

1,066

cycles

Remaining Cycles

78

%

Confidence

Likely failure mode: Corrosion

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

36mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-E-103
Functional LocationCDU / Preheat Train
ManufacturerAtlas Copco
Install Date2020-11-19
Runtime Hours64,539 hrs
Last Maintenance2026-06-27
Next Maintenance2026-12-20

AI Recommendation

Maintenance Recommendation Agent

E-103 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

CDU Preheat Train Inspection

Starts 2026-09-29 · 3 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-06-27

WO-20451 · Lubrication top-up

Closed · 2026-06-27

WO-20452 · Bearing replacement

Closed · 2026-06-27