Equipment HealthHydrocrackerF-137

Furnace F-137

Medium Criticality

F-137 · Furnace · Hydrocracker / Furnace Area 3 · Mfr. Elliott Group

Health trend improving
100%

Excellent

Failure Probability

3%

Anomaly Score

1

Remaining Useful Life

378 Days

RUL Confidence

83%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

378

days

Remaining Days

9,072

hrs

Operating Hours

2,314

cycles

Remaining Cycles

83

%

Confidence

Likely failure mode: Burner Fouling

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

26mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-137
Functional LocationHydrocracker / Furnace Area 3
ManufacturerElliott Group
Install Date2019-03-04
Runtime Hours89,776 hrs
Last Maintenance2026-02-02
Next Maintenance2027-05-07

AI Recommendation

Maintenance Recommendation Agent

F-137 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-02-02

WO-20451 · Lubrication top-up

Closed · 2026-02-02

WO-20452 · Bearing replacement

Closed · 2026-02-02