MU
Equipment HealthFCC UnitT-107

Power Recovery Turbine

High Criticality

T-107 · Turbine · FCC Unit / Power Recovery · Mfr. Elliott Group

Health trend stable
76%

Attention

Failure Probability

18%

Anomaly Score

22

Remaining Useful Life

180 Days

RUL Confidence

74%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

180

days

Remaining Days

4,320

hrs

Operating Hours

946

cycles

Remaining Cycles

74

%

Confidence

Likely failure mode: Bearing Wear

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

18mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-T-107
Functional LocationFCC Unit / Power Recovery
ManufacturerElliott Group
Install Date2016-07-18
Runtime Hours80,608 hrs
Last Maintenance2026-04-09
Next Maintenance2026-12-19

AI Recommendation

Maintenance Recommendation Agent

T-107 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

FCC Wet Gas Compressor Overhaul

Starts 2026-08-24 · 5 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-04-09

WO-20451 · Lubrication top-up

Closed · 2026-04-09

WO-20452 · Bearing replacement

Closed · 2026-04-09