MU
Digital TwinFCC UnitT-107
Back

Power Recovery Turbine — Digital Twin

Warning

T-107 · Turbine · FCC Unit / Power Recovery · Running · Normal Load

Criticality: High · Degradation: Early Degradation

76%

Attention

Failure Probability

18%

Remaining Useful Life

180 Days

Predicted Failure Mode

Bearing Degradation

RUL Confidence

74%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

87%

Trailing sensor-fused health

Live

Current

76%

Failure probability 18%

AI Predicted

Predicted · 180d horizon

68%

Bearing Degradation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration3.26 mm/s2–5 mm/sNormal0/hr
Temperature54.59 °C40–70 °CNormal0/hr
RPM1438.79 rpm1400–1500 rpmNormal0/hr
Motor Load64.65 %50–80 %Normal0/hr
Pressure4.72 bar4–6 barNormal0/hr
Flow99.48 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition88.18 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Bearing Degradation cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

T-107 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-T-107
Functional LocationFCC Unit / Power Recovery
ManufacturerElliott Group
Install Date2016-07-18
Runtime Hours80,608 hrs
Last Maintenance2026-04-09
Open Equipment Health record