MU
Equipment HealthOffsitesEP-117

Main Substation Panel EP-1

High Criticality

EP-117 · Electrical Panel · Offsites / Substation · Mfr. Emerson

Health trend improving
91%

Healthy

Failure Probability

16%

Anomaly Score

8

Remaining Useful Life

233 Days

RUL Confidence

77%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

233

days

Remaining Days

5,592

hrs

Operating Hours

1,031

cycles

Remaining Cycles

77

%

Confidence

Likely failure mode: Contact Overheating

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

26mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-EP-117
Functional LocationOffsites / Substation
ManufacturerEmerson
Install Date2015-08-17
Runtime Hours52,126 hrs
Last Maintenance2026-04-11
Next Maintenance2027-01-25

AI Recommendation

Maintenance Recommendation Agent

EP-117 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-04-11

WO-20451 · Lubrication top-up

Closed · 2026-04-11

WO-20452 · Bearing replacement

Closed · 2026-04-11