MU
Equipment HealthHydrocrackerR-142

Reactor R-142

Low Criticality

R-142 · Reactor · Hydrocracker / Reactor Area 2 · Mfr. Sulzer

Health trend declining
39%

Danger

Failure Probability

61%

Anomaly Score

51

Remaining Useful Life

102 Days

RUL Confidence

61%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

102

days

Remaining Days

2,448

hrs

Operating Hours

660

cycles

Remaining Cycles

61

%

Confidence

Likely failure mode: Thermal Cycling Fatigue

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

20mo

Advance Schedule

Accelerated degradation detected — vibration and anomaly score trending above baseline faster than model expectation.

Asset Details

Equipment IDEQ-R-142
Functional LocationHydrocracker / Reactor Area 2
ManufacturerSulzer
Install Date2017-10-20
Runtime Hours78,113 hrs
Last Maintenance2025-11-25
Next Maintenance2026-10-25

AI Recommendation

Maintenance Recommendation Agent

R-142 shows accelerating degradation. Recommend scoping into the next available shutdown window and pre-ordering thermal cycling fatigue spares.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-25

WO-20451 · Lubrication top-up

Closed · 2025-11-25

WO-20452 · Bearing replacement

Closed · 2025-11-25