Cooling Tower Fan CT-04
Medium CriticalityFN-115 · Fan · Utilities / Cooling Tower · Mfr. KSB
Attention
Failure Probability
40%
Anomaly Score
21
Remaining Useful Life
197 Days
RUL Confidence
72%
Health, Vibration & Temperature Trend
Trailing 30 days · sensor-fused signal
Remaining Useful Life
Generated by the Remaining Useful Life Agent
197
days
Remaining Days
4,728
hrs
Operating Hours
774
cycles
Remaining Cycles
72
%
Confidence
Likely failure mode: Bearing Wear
Maintenance Strategy Optimization
Current strategy: maintenance every 18 months
From
18mo
To
18mo
Equipment tracking within expected degradation envelope.
Asset Details
AI Recommendation
Maintenance Recommendation Agent
FN-115 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.
Recommended Shutdown
Shutdown Planning Agent
Utilities Boiler Emergency Repair
Starts 2026-08-09 · 2 days
Recent Work Orders
WO-20450 · Vibration inspection
Closed · 2026-06-02
WO-20451 · Lubrication top-up
Closed · 2026-06-02
WO-20452 · Bearing replacement
Closed · 2026-06-02