Cooling Tower Fan CT-04

Medium Criticality

FN-115 · Fan · Utilities / Cooling Tower · Mfr. KSB

Health trend stable
66%

Attention

Failure Probability

40%

Anomaly Score

21

Remaining Useful Life

197 Days

RUL Confidence

72%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

197

days

Remaining Days

4,728

hrs

Operating Hours

774

cycles

Remaining Cycles

72

%

Confidence

Likely failure mode: Bearing Wear

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

18mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-FN-115
Functional LocationUtilities / Cooling Tower
ManufacturerKSB
Install Date2018-08-26
Runtime Hours18,192 hrs
Last Maintenance2026-06-02
Next Maintenance2026-12-31

AI Recommendation

Maintenance Recommendation Agent

FN-115 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Utilities Boiler Emergency Repair

Starts 2026-08-09 · 2 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-06-02

WO-20451 · Lubrication top-up

Closed · 2026-06-02

WO-20452 · Bearing replacement

Closed · 2026-06-02