MU
Equipment HealthHydrocrackerF-148

Furnace F-148

Low Criticality

F-148 · Furnace · Hydrocracker / Furnace Area 4 · Mfr. KSB

Health trend improving
100%

Excellent

Failure Probability

8%

Anomaly Score

1

Remaining Useful Life

357 Days

RUL Confidence

86%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

357

days

Remaining Days

8,568

hrs

Operating Hours

1,322

cycles

Remaining Cycles

86

%

Confidence

Likely failure mode: Tube Coking

Maintenance Strategy Optimization

Current strategy: maintenance every 12 months

From

12mo

To

16mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-148
Functional LocationHydrocracker / Furnace Area 4
ManufacturerKSB
Install Date2022-12-07
Runtime Hours50,020 hrs
Last Maintenance2026-05-25
Next Maintenance2027-04-22

AI Recommendation

Maintenance Recommendation Agent

F-148 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-05-25

WO-20451 · Lubrication top-up

Closed · 2026-05-25

WO-20452 · Bearing replacement

Closed · 2026-05-25