MU
Equipment HealthOffsitesEP-171

Electrical Panel EP-171

High Criticality

EP-171 · Electrical Panel · Offsites / Electrical Panel Area 1 · Mfr. Sulzer

Health trend stable
73%

Attention

Failure Probability

22%

Anomaly Score

20

Remaining Useful Life

181 Days

RUL Confidence

87%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

181

days

Remaining Days

4,344

hrs

Operating Hours

614

cycles

Remaining Cycles

87

%

Confidence

Likely failure mode: Insulation Degradation

Maintenance Strategy Optimization

Current strategy: maintenance every 6 months

From

6mo

To

6mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-EP-171
Functional LocationOffsites / Electrical Panel Area 1
ManufacturerSulzer
Install Date2018-04-21
Runtime Hours51,847 hrs
Last Maintenance2026-05-19
Next Maintenance2026-12-20

AI Recommendation

Maintenance Recommendation Agent

EP-171 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-05-19

WO-20451 · Lubrication top-up

Closed · 2026-05-19

WO-20452 · Bearing replacement

Closed · 2026-05-19