MU
Equipment HealthUtilitiesP-139

Pump P-139

Medium Criticality

P-139 · Pump · Utilities / Pump Area 3 · Mfr. Ebara

Health trend stable
74%

Attention

Failure Probability

25%

Anomaly Score

24

Remaining Useful Life

242 Days

RUL Confidence

86%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

242

days

Remaining Days

5,808

hrs

Operating Hours

1,928

cycles

Remaining Cycles

86

%

Confidence

Likely failure mode: Bearing Wear

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

24mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-P-139
Functional LocationUtilities / Pump Area 3
ManufacturerEbara
Install Date2016-10-10
Runtime Hours39,473 hrs
Last Maintenance2025-12-05
Next Maintenance2027-01-31

AI Recommendation

Maintenance Recommendation Agent

P-139 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Utilities Boiler Emergency Repair

Starts 2026-08-09 · 2 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-12-05

WO-20451 · Lubrication top-up

Closed · 2025-12-05

WO-20452 · Bearing replacement

Closed · 2025-12-05