MU
Digital TwinUtilitiesP-139
Back

Pump P-139 — Digital Twin

Warning

P-139 · Pump · Utilities / Pump Area 3 · Running · Normal Load

Criticality: Medium · Degradation: Early Degradation

74%

Attention

Failure Probability

25%

Remaining Useful Life

242 Days

Predicted Failure Mode

Impeller Erosion / Cavitation

RUL Confidence

86%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

81%

Trailing sensor-fused health

Live

Current

74%

Failure probability 25%

AI Predicted

Predicted · 242d horizon

65%

Impeller Erosion / Cavitation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration3.39 mm/s2–5 mm/sNormal0/hr
Temperature53.4 °C40–70 °CNormal0/hr
RPM1436.63 rpm1400–1500 rpmNormal0/hr
Motor Load61.35 %50–80 %Normal0/hr
Pressure4.88 bar4–6 barNormal0/hr
Flow99.37 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition83.54 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Impeller Erosion / Cavitation cascade

Flow Deviates from Rated
Process Instability
Cavitation / Surge Risk Rises
Vibration Increases
Bearing Stress Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

P-139 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-P-139
Functional LocationUtilities / Pump Area 3
ManufacturerEbara
Install Date2016-10-10
Runtime Hours39,473 hrs
Last Maintenance2025-12-05
Open Equipment Health record