MU
Digital TwinHydrocrackerFN-151
Back

Fan FN-151 — Digital Twin

Healthy

FN-151 · Fan · Hydrocracker / Fan Area 3 · Running · Normal Load

Criticality: Low · Degradation: Normal

96%

Excellent

Failure Probability

7%

Remaining Useful Life

358 Days

Predicted Failure Mode

Bearing Wear

RUL Confidence

88%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

96%

Failure probability 7%

AI Predicted

Predicted · 358d horizon

95%

Bearing Wear trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.21 mm/s2–5 mm/sNormal-0.21/hr
Temperature44.68 °C40–70 °CNormal-0.23/hr
RPM1444.9 rpm1400–1500 rpmNormal-0.05/hr
Motor Load55.2 %50–80 %Normal-0.25/hr
Pressure4.69 bar4–6 barNormal-0.28/hr
Flow102.79 % of rated88–112 % of ratedNormal-0.26/hr
Lubrication Condition91.84 % quality70–100 % qualityNormal+0.07/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Bearing Wear cascade

Motor Load Increases
Winding Temperature Rises
Motor Insulation Stress Increases
Bearing Load Increases
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

FN-151 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-FN-151
Functional LocationHydrocracker / Fan Area 3
ManufacturerElliott Group
Install Date2020-07-08
Runtime Hours10,791 hrs
Last Maintenance2026-05-06
Open Equipment Health record