Emergency Generator G-901 — Digital Twin
HealthyG-114 · Generator · Utilities / Boiler · Running · Reduced Load
Criticality: High · Degradation: Normal
Excellent
Failure Probability
7%
Remaining Useful Life
261 Days
Predicted Failure Mode
Bearing Wear
RUL Confidence
84%
Digital Twin State Timeline
Historical → Current → AI Predicted → What-If Simulated
30 Days Ago
100%
Trailing sensor-fused health
Current
97%
Failure probability 7%
Predicted · 261d horizon
96%
Bearing Wear trend
What-If
—
Run a simulation to project this
Live Equipment Visualization
Component-level condition · click a component to inspect
Click a component to inspect its condition, sensor signals and simulate a component-level failure.
Live Sensor Panel
PLC / DCS / SCADA / IoT tags mapped to this asset
| Parameter | Current | Normal Range | Status | Trend |
|---|---|---|---|---|
| Vibration | 2.2 mm/s | 2–5 mm/s | Normal | -0.31/hr |
| Temperature | 41.11 °C | 40–70 °C | Normal | -0.23/hr |
| RPM | 1440.48 rpm | 1400–1500 rpm | Normal | -0.16/hr |
| Motor Load | 54.2 % | 50–80 % | Normal | -0.11/hr |
| Pressure | 4.76 bar | 4–6 bar | Normal | -0.07/hr |
| Flow | 103.52 % of rated | 88–112 % of rated | Normal | -0.12/hr |
| Lubrication Condition | 91.01 % quality | 70–100 % quality | Normal | +0.01/hr |
Vibration · 24h history
Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/sFailure Propagation Preview
Most probable cascade given current condition · full analysis available in What-If Simulation
Bearing Wear cascade
AI Recommendation
Maintenance Recommendation Agent
G-114 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.
Scenario History
Loading…
No simulations saved yet for this asset.