MU
Digital TwinUtilitiesG-114
Back

Emergency Generator G-901 — Digital Twin

Healthy

G-114 · Generator · Utilities / Boiler · Running · Reduced Load

Criticality: High · Degradation: Normal

97%

Excellent

Failure Probability

7%

Remaining Useful Life

261 Days

Predicted Failure Mode

Bearing Wear

RUL Confidence

84%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

97%

Failure probability 7%

AI Predicted

Predicted · 261d horizon

96%

Bearing Wear trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.2 mm/s2–5 mm/sNormal-0.31/hr
Temperature41.11 °C40–70 °CNormal-0.23/hr
RPM1440.48 rpm1400–1500 rpmNormal-0.16/hr
Motor Load54.2 %50–80 %Normal-0.11/hr
Pressure4.76 bar4–6 barNormal-0.07/hr
Flow103.52 % of rated88–112 % of ratedNormal-0.12/hr
Lubrication Condition91.01 % quality70–100 % qualityNormal+0.01/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Bearing Wear cascade

Pressure Deviates from Setpoint
Seal Stress Increases
Leakage Risk Increases
Flow Instability
Cavitation / Surge Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

G-114 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-G-114
Functional LocationUtilities / Boiler
ManufacturerSiemens Energy
Install Date2022-04-09
Runtime Hours75,200 hrs
Last Maintenance2025-11-04
Open Equipment Health record