MU
Digital TwinCatalytic ReformerG-134
Back

Generator G-134 — Digital Twin

Degrading

G-134 · Generator · Catalytic Reformer / Generator Area 1 · Running · Normal Load

Criticality: Low · Degradation: Accelerated Degradation

48%

Critical

Failure Probability

50%

Remaining Useful Life

115 Days

Predicted Failure Mode

Rotor Imbalance

RUL Confidence

74%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

57%

Trailing sensor-fused health

Live

Current

48%

Failure probability 50%

AI Predicted

Predicted · 115d horizon

30%

Rotor Imbalance trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration4.86 mm/s2–5 mm/sNormal+0.1/hr
Temperature60.12 °C40–70 °CNormal+0.23/hr
RPM1420.51 rpm1400–1500 rpmNormal+0.32/hr
Motor Load71.27 %50–80 %Normal+0.08/hr
Pressure4.53 bar4–6 barNormal+0.31/hr
Flow91.07 % of rated88–112 % of ratedNormal+0.17/hr
Lubrication Condition71.6 % quality70–100 % qualityNormal-0.05/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Rotor Imbalance cascade

RPM Deviates from Nominal
Rotor Dynamic Forces Change
Bearing Load Pattern Shifts
Vibration Increases
Shaft Fatigue Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

G-134 shows accelerated degradation. Recommend opening a What-If simulation to quantify the risk of continued operation and identify the optimal intervention window.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-G-134
Functional LocationCatalytic Reformer / Generator Area 1
ManufacturerFlowserve
Install Date2016-07-07
Runtime Hours12,147 hrs
Last Maintenance2026-04-13
Open Equipment Health record