MU
Digital TwinOffsitesGB-123
Back

Gear Box GB-123 — Digital Twin

Normal

GB-123 · Gear Box · Offsites / Gear Box Area 4 · Running · Normal Load

Criticality: Low · Degradation: Normal

89%

Healthy

Failure Probability

11%

Remaining Useful Life

306 Days

Predicted Failure Mode

Lubrication Failure

RUL Confidence

91%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

89%

Failure probability 11%

AI Predicted

Predicted · 306d horizon

85%

Lubrication Failure trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.66 mm/s2–5 mm/sNormal-0.34/hr
Temperature45.29 °C40–70 °CNormal-0.19/hr
RPM1446.51 rpm1400–1500 rpmNormal-0.09/hr
Motor Load61.99 %50–80 %Normal-0.2/hr
Pressure5.13 bar4–6 barNormal-0.27/hr
Flow99.3 % of rated88–112 % of ratedNormal-0.25/hr
Lubrication Condition87.97 % quality70–100 % qualityNormal+0.08/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Lubrication Failure cascade

Lubrication Condition Deteriorates
Friction Increases
Bearing Temperature Rises
Wear Rate Accelerates
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

GB-123 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-GB-123
Functional LocationOffsites / Gear Box Area 4
ManufacturerEbara
Install Date2018-01-07
Runtime Hours56,527 hrs
Last Maintenance2025-12-31
Open Equipment Health record