MU
Digital TwinHydrogen PlantK-111
Back

Hydrogen Recycle Compressor — Digital Twin

Normal

K-111 · Compressor · Hydrogen Plant / PSA Section · Running · Normal Load

Criticality: Medium · Degradation: Early Degradation

79%

Attention

Failure Probability

25%

Remaining Useful Life

259 Days

Predicted Failure Mode

Fouling

RUL Confidence

76%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

86%

Trailing sensor-fused health

Live

Current

79%

Failure probability 25%

AI Predicted

Predicted · 259d horizon

72%

Fouling trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration3.28 mm/s2–5 mm/sNormal0/hr
Temperature48.59 °C40–70 °CNormal0/hr
RPM1432.97 rpm1400–1500 rpmNormal0/hr
Motor Load60.89 %50–80 %Normal0/hr
Pressure4.42 bar4–6 barNormal0/hr
Flow93.75 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition81.97 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Fouling cascade

Pressure Deviates from Setpoint
Seal Stress Increases
Leakage Risk Increases
Flow Instability
Cavitation / Surge Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

K-111 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-K-111
Functional LocationHydrogen Plant / PSA Section
ManufacturerElliott Group
Install Date2015-10-08
Runtime Hours63,038 hrs
Last Maintenance2025-12-03
Open Equipment Health record