MU
Digital TwinHydrocrackerK-181
Back

Compressor K-181 — Digital Twin

Warning

K-181 · Compressor · Hydrocracker / Compressor Area 1 · Running · Normal Load

Criticality: Low · Degradation: Early Degradation

66%

Attention

Failure Probability

37%

Remaining Useful Life

217 Days

Predicted Failure Mode

Bearing Degradation

RUL Confidence

75%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

73%

Trailing sensor-fused health

Live

Current

66%

Failure probability 37%

AI Predicted

Predicted · 217d horizon

54%

Bearing Degradation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration4.31 mm/s2–5 mm/sNormal0/hr
Temperature52.75 °C40–70 °CNormal0/hr
RPM1419.96 rpm1400–1500 rpmNormal0/hr
Motor Load69.75 %50–80 %Normal0/hr
Pressure4.57 bar4–6 barNormal0/hr
Flow95.57 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition76.72 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Bearing Degradation cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

K-181 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-K-181
Functional LocationHydrocracker / Compressor Area 1
ManufacturerElliott Group
Install Date2016-09-04
Runtime Hours68,502 hrs
Last Maintenance2026-01-04
Open Equipment Health record