MU
Digital TwinOffsitesM-154
Back

Motor M-154 — Digital Twin

Normal

M-154 · Motor · Offsites / Motor Area 2 · Running · Normal Load

Criticality: Medium · Degradation: Early Degradation

78%

Attention

Failure Probability

20%

Remaining Useful Life

279 Days

Predicted Failure Mode

Winding Insulation Breakdown

RUL Confidence

73%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

87%

Trailing sensor-fused health

Live

Current

78%

Failure probability 20%

AI Predicted

Predicted · 279d horizon

70%

Winding Insulation Breakdown trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration3.35 mm/s2–5 mm/sNormal0/hr
Temperature51.02 °C40–70 °CNormal0/hr
RPM1447.83 rpm1400–1500 rpmNormal0/hr
Motor Load60.44 %50–80 %Normal0/hr
Pressure4.69 bar4–6 barNormal0/hr
Flow96.57 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition86.7 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Winding Insulation Breakdown cascade

Motor Load Increases
Winding Temperature Rises
Motor Insulation Stress Increases
Bearing Load Increases
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

M-154 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-M-154
Functional LocationOffsites / Motor Area 2
ManufacturerWeir Group
Install Date2024-01-14
Runtime Hours63,350 hrs
Last Maintenance2025-12-30
Open Equipment Health record