MU
Digital TwinOffsitesM-160
Back

Motor M-160 — Digital Twin

Healthy

M-160 · Motor · Offsites / Motor Area 3 · Running · Reduced Load

Criticality: Medium · Degradation: Normal

98%

Excellent

Failure Probability

6%

Remaining Useful Life

360 Days

Predicted Failure Mode

Rotor Imbalance

RUL Confidence

83%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

98%

Failure probability 6%

AI Predicted

Predicted · 360d horizon

97%

Rotor Imbalance trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration1.98 mm/s2–5 mm/sWarning-0.13/hr
Temperature42.45 °C40–70 °CNormal-0.07/hr
RPM1448.31 rpm1400–1500 rpmNormal-0.12/hr
Motor Load54.77 %50–80 %Normal-0.07/hr
Pressure5.1 bar4–6 barNormal-0.06/hr
Flow103.4 % of rated88–112 % of ratedNormal-0.32/hr
Lubrication Condition97.4 % quality70–100 % qualityNormal+0.04/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Rotor Imbalance cascade

RPM Deviates from Nominal
Rotor Dynamic Forces Change
Bearing Load Pattern Shifts
Vibration Increases
Shaft Fatigue Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

M-160 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-M-160
Functional LocationOffsites / Motor Area 3
ManufacturerElliott Group
Install Date2017-06-18
Runtime Hours24,075 hrs
Last Maintenance2026-03-07
Open Equipment Health record