Shutdown Simulation
Simulation Dashboard — select a unit, shutdown date, duration and budget; the Simulation Agent calculates scope, material & manpower readiness, budget sufficiency, risk and ROI
Simulation Parameters
10 days
2 days21 days
Leave blank to use the AI-estimated requirement — enter a figure to test sufficiency against a fixed budget.
The Simulation Agent evaluates equipment health, maintenance backlog, inventory, manpower availability and historical job durations to project scope, cost, and completion probability.
Configure parameters and run a simulation
Results include equipment scope, spare parts availability, manpower plan, budget sufficiency, production impact, downtime, risk, ROI and a recommendation.